OpenContract NoticeSupplies🇪🇺 EU FundedTED 91/2026

Supply of equipment – EV Chargers

Publication (OJ)

May 8, 2026

Submission Deadline

Jul 10, 2026

Contract Duration

8.9 months

Procedure Type

Open procedure

Buyer headquarters

Strumica — MK004

Description

The contract concerns the supply, delivery, installation, connection, testing and commissioning of six fast electric vehicle (EV) charging stations in the South­-East of North Macedonia, to be installed in the municipalities of Strumica, Gevgelija, Valandovo, Radovish, Dojran and Novo Selo. The charging stations shall be supplied in accordance with the technical specifications defined in the tender documentation and shall fully comply with all applicable EU safety, technical and performance standards. Each charging station will be mounted on an appropriate concrete foundation and connected to the electrical grid, including all necessary civil, electrical and auxiliary works required for full operational readiness. The scope of the contract includes, but is not limited to: • Supply, delivery and installation of the EV charging stations with the technical characteristics defined in the tender specifications; • construction of foundation bases for each charging station; • electrical connection works, including cable lines, disconnection boxes and all required protective elements; • installation of vehicle stop elements and vertical and horizontal traffic signage and markings related to the charging points; • testing and commissioning of the installed equipment to ensure safe and proper operation. The contractor shall also provide training for designated local personnel on the operation and routine maintenance of the charging stations, as well as warranty coverage and aftersales support throughout the warranty period. All required documentation, certificates of conformity, technical manuals and as­built documentation must be delivered to ensure correct use, maintenance and long­term functionality of the equipment. Delivery, installation, testing and commissioning of the charging stations must be completed within the timelines defined in the project implementation schedule. The charging infrastructure is intended to promote sustainable transport, encourage low ­carbon mobility and contribute to the development of regional electric vehicle infrastructure.

CPV Codes

311580003115810034144900

Lots (1)

LOT-0001Supply of equipment - Electric Vehicle Chargers

The contract concerns the supply, delivery, installation, connection, testing and commissioning of six fast electric vehicle (EV) charging stations in North Macedonia, to be installed in the municipalities of Strumica, Gevgelija, Valandovo, Radovish, Dojran and Novo Selo. The charging stations shall be supplied in accordance with the technical specifications defined in the tender documentation and shall fully comply with all applicable EU safety, technical and performance standards. Each charging station will be mounted on an appropriate concrete foundation and connected to the electrical grid, including all necessary civil, electrical and auxiliary works required for full operational readiness. The scope of the contract includes, but is not limited to: • Supply, delivery and installation of the EV charging stations with the technical characteristics defined in the tender specifications; • construction of foundation bases for each charging station; • electrical connection works, including cable lines, disconnection boxes and all required protective elements; • installation of vehicle stop elements and vertical and horizontal traffic signage and markings related to the charging points; • testing and commissioning of the installed equipment to ensure safe and proper operation. The contractor shall also provide training for designated local personnel on the operation and routine maintenance of the charging stations, as well as warranty coverage and aftersales support throughout the warranty period. All required documentation, certificates of conformity, technical manuals and as-built documentation must be delivered to ensure correct use, maintenance and long-term functionality of the equipment. Delivery, installation, testing and commissioning of the charging stations must be completed within the timelines defined in the project implementation schedule. The charging infrastructure is intended to promote sustainable transport, encourage low-carbon mobility and contribute to the development of regional electric vehicle infrastructure.

3115800031158100341449008.9 months